Guest viewing is limited

WinPE MCBoot VN Version 9.1 build 080822 Pro 2022 (1 Viewer)

smooththou

CmTeamPK Uploader
Jun 5, 2022
515
17
18
27
PAKISTAN
Offline
th-l-EKpd-Ahfv8-Wbs-G7yezkl5-Y2-GOEQn6l28.jpg




WinPE MCBoot VN Version 9.1 build 080822 Pro 2022

x64 | Language: English | File Size: 3.8 GB


Windows PE (WinPE) is a small operating system used to install, deploy, and repair Windows desktop editions, Windows Server, and other Windows operating systems.

This is the BOOT MENU for two MBR standards - legacy and UEFI-GPT
- Grub4 boot menu for Dos: Boot to PE Windows, Partition Wizard, Partition Guru, Konboot, Memtest, MHDD, ghost 11.5, HDD regenerator, Active Password Changer. .. and many other useful tools
- Win Pe includes: PE Win 11 pro x64, Win 10 pro x64, Win 10 pro x86, Win 8.1 pro x86, with complete recovery software on Mini Windows: Acronis TrueImage, Norton Ghost, Partition Wizard, Aomei Partition, Section Guru...
- Tools Dos Partition Wizard, Partition Guru, Konboot, Memtest, MHDD, ghost 11.5, hard drive regenerator, Active Password Changer
Support for virus scanning (Kaspersky Rescue, Avira Rescue, Eset, Dr.Web)
- Dos Grub2 tool
- Transfer interface in Dos and windows pe friendly.
* System update and bug fixes
- One-click upgrade supports creating USB-HDD boot easily and conveniently
- Update wifi driver for win pe x64-86, good support for new machines
- Update all lan, Wifi, vega, Graphics, NVIDIA Geforce GT drivers,
- Updated driver for card readers, USB 3.0-3.1 ports for portable set-top boxes
- Update installation Windows 7-8-10 AIO support install win
- Update Hiren't boot 10.0 final
- Win pe supports the following win versions
+ Update Mini Windows 10 32Bit,
+ Update Mini Windows 10 64Bit,
+ Update Mini Windows 11 64Bit,
+ Update Mini Windows 8.1 32Bit_lite
+ Support loading admin with temviewer,
+ Win mini xp: support for machines with a weak configuration
- Dos boot update with win x86 UEFI
- Updated support for machines with NVMe drives for Gen 11 laptops to find and display hard drives in
Windows
pe
- fixed error Acronis true Image 2020 does not allow backup
- Fixed bug when booting win 8.1 pe app icons not showing on screen
- Fixed complete virtual disk error
- fix DrWeb antivirus software error 1746 on win pe x64
* update some programs to the latest version, get more detailed and complete information about the software.

Features between Free and Pro
- The Apps on the new fully updated win
- Nvme intel drive interface gene 7.8,10, 11
- Boo Boo Boo Boo Boo Boo!
- Get Wifi, mouse intel gen 11, 12+
- Support integrated windows installation
- EasyBCD 2.4 -. EasyUEFI Fix computer error
- UEFI boot support application on Dos
- Integrating Micorsoft Net Framwork and C+
- Integrate Test (1) test (1), (b) Test (1)
-.. Integrated Ullman PPI (1) Removal of the patient Mstsc.
- Support phone connection and network sharing will be networked from the phone via the computer
- Support Electric connection thai (MARKING) Divide the number of days
- Support phone connection (R) Divide the power of the phone accessory network
- Fast boot speed, running smooth applications



HOMEPAGE

Code:
https://hoanchien.blogspot.com/


DOWNLOAD RAPIDGATOR


Code:
https://rapidgator.net/file/7bf8fcf91516239de0da9e6f2b225995/MCboot_vn_v9.1_build_080722_Pro.part1.rar.html
https://rapidgator.net/file/78f13a61d40f6c5198a3c10336dc89d4/MCboot_vn_v9.1_build_080722_Pro.part2.rar.html
https://rapidgator.net/file/0c1ffa46c7e2af0d8d84a07794daf0db/MCboot_vn_v9.1_build_080722_Pro.part3.rar.html
https://rapidgator.net/file/82ec83e1a757c8479a32ce347a4c4f0f/MCboot_vn_v9.1_build_080722_Pro.part4.rar.html


DOWNLOAD UPLOADGIG

Code:
https://uploadgig.com/file/download/0CcddB0C6aa14b56/MCboot_vn_v9.1_build_080722_Pro.part1.rar
https://uploadgig.com/file/download/0cC90ba970ca08f3/MCboot_vn_v9.1_build_080722_Pro.part2.rar
https://uploadgig.com/file/download/05Fd3f4B50595aa3/MCboot_vn_v9.1_build_080722_Pro.part3.rar
https://uploadgig.com/file/download/01Eec8729f06ec1d/MCboot_vn_v9.1_build_080722_Pro.part4.rar
 

Users who are viewing this thread

34,372Threads
46,471Messages
8,750Members
Astro67867Latest member
Top